Located in Brighton, Colorado, RCD Construction completed the following:

- 200,00 CY of overlot grading

- 25,000 CY of road and building sub ex.

- 6,650 LF of 8" sewer

- 7,000 LF of 8" and 12" water

- 6,700 LF mountable curb and gutter

- 5,400 LF of 10' sidewalk

- Traffic control to 27th AVE

- 1,900 LF of 66" and 72" storm sewer